Logging the Timber of Life
| Day | 13th | 14th | 15th | 16th | 17th | |||||
| 0900 | 2100 | 0900 | 2100 | 0900 | 2100 | 0900 | 2100 | 0900 | 2100 | |
| Stress | 8 | 8* | ||||||||
| Fanfest | 0 | 0 | ||||||||
| ↕️ | ↔️ | ⬇️* | ||||||||
* What might otherwise have been a 7.5 by evening was kept at 8 by a day spent feeling a tightness in the chest (although, please note: BP & heartrate not unusually elevated) - a physical symptom of anxiety and uncomfortable.
| 13th | 14th | 15th | 16th | 17th | 18th | 19th | 20th | 21st | |
| AM | Read book in garden for lunch break | ||||||||
| PM | Ate half the nice potatoes with an M&S cheese & ham over chicken dinner - tasty tasty goodness all around. |
Things ordered/bought:
- In-line ignitor switch
- Heating element (small)
- Steel buckets
- Plug end
- Cabling
Things Done:
- This list & tables
- Agreed email w/JS to ask for battery data
- Looked at length into available dataloggers in UK
- Chatted briefly to Christopheles about wiring up BBQ lighter (or similar) element to plug
Things that need buying/ordering:
- Thermocouple data loggers/DAQ (min. 16 channels, preferably 24+) - Expensive, WISH approval needed
- SRF bale - difficult to source
Things that need doing:
- Call MG, re: site address, dates etc. - URGENT but I still haven't done it, I can't summon the energy for it tonight
- Wire up microDAQ - also URGENT and also not been done today even though it was today's priority
- Wire up ignitor
- Email JB re: collab w/ULancsh via DTC's new (battery fires) funded spot
- Test ignitor, even just once, to see if it can work
- Decide on August ignition method
- Call AS (not before 20/07) re: monitoring, SRF bale etc.
- Investigate ease of adding FLIR camera to Burn Box
- Sort out van hire and moving of equipment to site
- Wire up DAQs beforehand - label TCs
Chatter